Useful prompts
- Summarize unresolved markups on the current architectural set.
- Which sheets changed between the last two revisions?
- List RFIs connected to drawing markups that still need answers.
- Show takeoff quantities by room for the first floor.
- What drawing issues should I review before tomorrow’s owner meeting?
Bad prompts
- “Tell me everything” — too broad.
- “Is this safe to build?” — requires professional judgment outside the connector.
- “Change the project budget” — not a read-only connector task.
Use Claude as a reviewer, not the authority
Claude can organize and explain Redliner context quickly. The builder, architect, estimator, or PM still owns the decision.